top of page

MAPLEHURST CORRECTION CENTRE

This project involved electrical work associated with a roof replacement completed during the summer. Our scope included the careful removal and reinstallation of existing electrical infrastructure to facilitate roofing activities while maintaining system integrity.

Cable trays, conduits, and associated wiring were safely disconnected, removed, and protected prior to the start of roofing work. Following the completion of the roof replacement, all electrical components were reinstalled, secured, and tested to ensure proper operation.

In addition, all rooftop units (RTUs) were professionally disconnected before construction and reconnected afterward, ensuring minimal disruption and full restoration of mechanical systems.

The project was completed in close coordination with the roofing contractor and other trades, ensuring safety, efficiency, and compliance with all applicable electrical codes and standards. All systems were successfully tested and commissioned, delivering a reliable and fully operational installation.

bottom of page